top of page

services

interior's hands drawing home illustrati
Balsa wood template arranged and glued f
Kitchen Interior with Island - Main Wed
Design

At East Cobb Renovation we strive to make the space you are remodeling in your home not only more up to date, organized and functional, but beautiful and inspirational.  The design process begins with a discussion of your wants and needs which leads us to be able to design a space that will bring you joy for years to come.

Remodel

Remodeling is a big event, whether it's a room or your whole house, and most projects require similar steps. 

1. Design

2. Implement

  • We will meet with you to review the design plan for feasibility and/or suggestions that may improve flow or conserve costs.

  • Select materials and products for the project, especially those that are needed right away and those that require several weeks' lead time (such as cabinets).

  • If desired East Cobb Renovation will draw up a detailed construction schedule to manage the process.

  • We will apply for all needed building permits, and round up and schedule construction crews.

3. Confer

  • We will request that you tour your house with us and any other key players to go over exactly what needs to be done. We will take notes and send follow-up memos if anything changes from the plans.

4. Set Up

  • Remove personal belongings from the work area.

  • If appropriate, set up a mini kitchen in another part of the house.

  • We will set in place a trash bin, portable toilet, etc. if needed.

  • Make room for large supplies, such as rafters or drywall, which are delivered at this point.

5. Remodel/Build

Finishing Touches

The finishing stages and walk through of your renovation is essential to being completely satisfied with your new space. 

 

East Cobb Renovation will tour the remodeled space with you, itemizing any details that need to be finished and any mistakes that need to be corrected; we will keep a detailed list but ask that you do as well to ensure 100% satisfaction.

 

We will complete a final inspection with you, checking off the items from your preliminary walk-through.

We will also go over instructions for any equipment and discuss warranties.

 

Let the new space settle in for a few months. Make sure all systems work properly, and watch for drywall cracks or nail pops. We expect you to call us for any follow-up repairs; we will check back periodically to make sure everything is right.

bottom of page